Thursday, 17 January 2008

A week of disruption

We had never before had a new kitchen fitted. Last week was planned for the installation for installation to start. The units arrived the previous Friday at just after 7am in the dark. On the Sunday we had to clear everything from the old units and so for a week, the contents of the kitchen were spread between the lounge, the utility room, the garage and even in the study. This is not a pleasant experience.

Monday saw the removal of all the old units and it was off to Pizza Hut for our favourite deep pan supreme, and it was very tasty. On Tuesday the new oven arrived, but not connected, so we went to the Five Bells for dinner, which was also very good. By Wednesday, we had the oven available so we were able to cook, but the washing up had to be done in a bowl on the floor. And finding plates and implements was a nightmare.

It was Friday lunchtime before the units were complete and we could start moving stuff back in. There should have been two fitters, but one was ill, so it took longer than expected. But it was all worth it in the end. Our fitter was excellent. He did all the plumbing and electrics and made a very good job, even setting the units back from the wall so that the dishwasher no longer stands proud. Friday also saw the men arrive to make templates for the Corian worktops.

By Sunday, the lounge and study were tidy and we are left with a few things in the utility and garage awaiting some drawer liners which I have just fitted. This week I have been sanding down where I filled after taking off the alarm trunking, where the old tiles are being replaced by paint etc. Then using fine filler (what a find this has been) to smooth over the joins. All ready for painting this weekend before the worktops arrive next Friday. Then all that is left is the wall tiling on the sink and oven wall, and floor coverings yet to be chosen. Photos to follow when all is finished.

No comments: